On New Year's Eve day, it was ready. We had a little picnic in the basement:

John's sophisticated fan hanging and cord management system are shown here:

The concrete arrived a few days later. It was sent down a chute through the basement window:

The Hampshire Concrete Team places the concrete:


Then they troweled it and the floor was done. Once set, George Propane brought in a cabinet heater (much better than the previous heater). John now uses this with the fans to manage moisture and keep the slab from freezing.