Wednesday, December 30, 2009

Closure

As temperatures drop, and and winter is officially here, we're anxious to finish closing the house to the weather. Now that the roof framing is in place it's time to sheath the gable ends, roof overhangs, and the roof itself. The goal is to accomplish this before the holidays. Realizing that some extra hands are necessary, John starts making phone calls. David (from next door), says he can be available starting the next day! Krzys rearranges his busy schedule and helps too. Back at the shop, John cuts and primes the gable brackets and pine board sheathing (for the overhang). Meanwhile, Gary is trenching for the underground utilities. More about this will be in our next post.

David and John pose with the sheathed gable ends:



Roof parts -- gable brackets:


Roof parts -- pine board sheathing:
John takes a break from making roof parts in the shop:


Installed gable grackets:

Brackets and pine board sheathing:



Rafter tails and pine board sheathing:

The roof is now ready for the plywood sheathing:


Finally, the roof is sheathed. It's the Afternoon of December 23rd, cold, and windy. The guys comment about hauling 4 by 8 foot pieces of plywood up to the roof in the cold and gusty winds. It's a challenge! And It's done ... well, almost ... John installs the last piece:
(click to enlarge)

On December 24th, the morning is spent applying the roof paper. This will protect it until the final material is installed. Gary, Kryzs, John and David take a morning break to refuel with eggnog and pastries:

Then it's back to the final pieces:


By mid afternoon, they're finished:


Merry Christmas!

Wednesday, December 16, 2009

P.S. to Roof Framing

By the time the roof framing was finished yesterday, it was already too dark to take photos.
Days are pretty short lately. John took these photos today.

Here are the rafter tails:


North side of house:


And the south side:


The finished and backfilled barn foundation:

Tuesday, December 15, 2009

Framing the Roof

Later last week and through the weekend, John prepped for framing the roof. Rafters, jack rafters and headers were cut and notched. On Monday Paul helped with finishing the rafter tails. These had to be cut, sanded, have the edges routed, and be sanded again. In all, 39 full length rafters were finished along with miscellaneous partial rafters and other pieces. These were ready for Tuesday's group of volunteers who also happen to be our neighbors. Talk about being neighborly!

Thank you Paul, Fred, Eric and David.


Here's Eric and his son David bringing up rafters from below:



Paul and David place the rafters:



Almost there:



We took another break on Sunday to celebrate Mr. Bean's 3rd birthday. (The candle was lit many times over...they're fun to blow out!)


The Second Deck, Thank You

The week of December 7th became a race against Wednesday's forecast for snow. The goal being, to have the second floor decking on prior to this event. Future work would be much easier if the first floor were enclosed. John spent Monday putting up the remaining second floor joists and preparing for a party of volunteers. On Tuesday our goal was reached with extraordinary group effort. (Because everyone was so busy helping, we neglected getting any photos during this work day.)
Thank you Paul, Fred, Krzys, Mariah, Ruthie and Rachel!
Sure enough, it snowed. Here's what the site looked like later in the week:


Knee walls were added too:


About one foot of snow fell followed by a delightful topping of rain:
The knee walls were sheathed and Paul put plastic over the window openings. Now there's a protected place to work:
Tarps are a very handy invention. This one will help keep the decking dry.:
View from second floor looking out toward the street:
The barn foundation was also poured. Because of the cold temperature, it was wrapped up in blankets to keep it from freezing (heat is produced as concrete cures):
After a long and productive week, we took Saturday morning off to cut a Christmas tree for the High Street household:

Monday, December 7, 2009

Wally World

Another week has quickly flown by. It's Monday morning Nov. 30th. The days are becoming very short and much cooler. Paul arrives ready to help frame the first floor walls with John. Rachel and Fred also help out during the week.

After a tutorial from John, Paul frames one of the walls:


Nice work! (yes, it's a different wall, but you get the idea...)




Sidenote: Paul also builds stone walls. Here's the one he built at his home down the street.



Fred arrived the next day to offer his skills:



And John used his wrassling skills to put this wall where it belonged:


By friday, the first floor walls were sheathed and ready for the second floor beams and joists.

John makes some last minute notes on his PDA for the next workday:


It was bound to happen -- a few inches of snow fell on Saturday night. Sunday morning, Krzy and Eileen shovel the floor decking:

John brushes snow off the top:


We nail MicroLam boards together and create two twelve foot carrying beams. Then Krzy and Eileen nail joist hangers into this very hard wood. We're experts by the time they're all nailed on, and still have all our fingers (we think....it's pretty cold).

Krzy and John then lay the two beams end to end across two thirds of the length. (The last third is a structural wall.) The beams are extremely heavy. These guys ace it:

Later on, Eileen cuts joists for John to put in place. It was a productive day.

Deja-Vu??? No, its footings for the barn. Once the barn foundation is in, trenching for electric power can begin.

Monday, November 30, 2009

The Dance Floor

The sills are finished. Next, John and our neighbor Fred set a heavy "MicroLam beam", (engineered lumber), which will support the floor. This is not a one-person job. Fred's muscle and willingness to help is appreciated. His loaned generator has really helped too.

Here's the MicroLam in place:



And the floor joists:


A few days later, it's the last day of a long Thanksgiving weekend. Many are traveling back home or shuffling through crowded holiday craft fairs looking for that perfect gift. Up at 105, we're about to embark on one of the funnest steps in house building: sheathing the deck.
Eileen cheerfully holds the chalk line to align the first piece of plywood:


Mr. Bean observes Papa Bean hammering a nail:


Now he must try it himself (with Mom's assistance):


Rachel prepares to spread glue on the joists:

And she's got it down:

John marks the plywood:

Then we pound the tongue and groove plywood into place:

Whoa! Rachel traded in the glue gun for the bigger nail gun:


And she's off. She had the entire deck nailed down by day's end:

John's 23 year old nail gun broke about 2 dozen nails short of finishing. Rachel's willing to finish nailing the old fashioned way:

Krzy and Rachel pound the last few nails.

And there are still plenty more left:


The deck is done. Time to put on our dancing shoes! It's really beginning to feel like a house. We spend a while wandering through the rooms before taking our weary selves home. It was a productive and enjoyable family workday.